Appraisals26-1038 Riverside Parkway ROW › Proof walkthrough

26-1038 · Riverside Parkway ROW — Parcel 42 · 18.6 ac taking

Rural Land & Ranch 1.1.0 Eminent Domain 2.0.1 TxDOT ROW 1.3.0 In review
Report 84% assembled
38/45 sections
Client State of Texas — TxDOT ROW DivisionIntended use Eminent-domain acquisitionInterest Fee (part taken) + remainderEffective May 12, 2026Hearing Sep 3, 2026Appraiser Dana WhitfieldReviewer Sam Ortiz
PROOF-01 · the pack promise, proven with a second complete job. A table-heavy eminent-domain assignment traverses the same five stages as the rural financing job — no new navigation, no new screens. The Eminent Domain add-on deepens Overview, Subject, and Analysis; the TxDOT jurisdiction pack adds an agency-form output to Report. Compare any section against 26-1041 to see the constant rail carrying different work.
1

Overview — assignment & conditions

+ taking & hearing facts
AssignmentJust compensation — partial acquisition Whole property214.8 ac, Kendall County Part taken18.6 ac fee + 2.1 ac temp. construction easement Date of takingMay 12, 2026 (per court order) Special commissionersHearing Sep 3, 2026
Jurisdiction stack1 · txdot-row 1.3.0 → 2 · tx-core 2.1 (ordered, pinned) EA / HCEA-2: remainder access per TxDOT schematic RW-4211 TeamDana Whitfield signs · Sam Ortiz counter-signs

The add-on materializes structured fields in the same Overview sections — no new stage, no new tab.

2

Subject — taking geometry

+ before / taking / remainder slices
SliceDefinitionAcres
Whole beforeLarger parcel as of the date of taking214.8
Part takenFee strip along FM 3351 frontage — TxDOT Parcel 4218.6
Temp. easementConstruction easement, 24 months2.1
Remainder afterWhole less part taken — severed frontage, revised access196.2

Slices are the same parcels-and-slices machinery the rural job uses for the larger-parcel question — the add-on just names the eminent-domain slices and wires them to the before/after contexts in Analysis.

3

Comparables — same database, same finder

8 attached · frozen snapshots

Eight verified sales attached as frozen snapshots from the firm’s Ring 1 database — including two highway-frontage takings resales used for severance-damage support. Nothing here is eminent-domain-specific: the same attached-comps lane, the same ranked finder, the same Explorer in job context.

4

Analysis — before / after & compensation

table-heavy pack modules

Before / after valuations ADD-ON

ContextAcres$/acValue
Whole property · before214.8$20,000$4,296,000
Remainder · before196.2$20,000$3,924,000
Remainder · after196.2$19,495$3,825,000

Two more valuation contexts on the same grid engine — each runs the standard two-stage adjustment grid.

Compensation worksheet ADD-ON

ComponentAmount
Part taken — 18.6 ac × $20,000$372,000
Damages to remainder (severance · access)$99,000
Special benefits (offset)$0
Temporary construction easement — 2.1 ac · 24 mo$12,400
Total just compensation$483,400
🔒 APPRAISER-ONLY · CONCLUSIONS
Total just compensation — $483,400, concluded by Dana Whitfield from the before/after contexts above. The assistant drafted the worksheets; the conclusion, as always, is set and re-concluded only by the appraiser.
5

Report — same Studio, plus the agency form

+ Form ROW-A-5

Pack regions in the outline

The document gains a Before & after analysis region ADD-ON and a Compensation summary region ADD-ON; the output switcher offers Narrative ↔ Form ROW-A-5 JURISDICTION — TxDOT’s form rendered from the same merged values. Removing a pack removes its regions cleanly.

Everything else is identical

The editable Studio, in-document suggestion preview, named versions with exact capture, snapshot-only history, Word / PDF / print / deliver, and signing are job-type-independent — nothing about the report pipeline knows this is an eminent-domain job.

The proof: a second, table-heavy appraisal type traversed all five stages with pack-added analysis, report regions, and an agency-form output — and the navigation never changed shape.

Groundsworth · prototype v2.1 · proof walkthrough (PROOF-01, gap analysis 2026-07-24) · prototype guide & site map